Innovus Consulting

Study cases

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa.

GEF Orinoquia

Gef global environment facility logo

Design of a capacity building strategy for a multi-actor project

Image here template (1)

The challenges

  • Design a capacity strengthening strategy

    that responded to the challenges of a multi-stakeholder project over a wide area of ​​the Colombia territory.

  • Design a strategy that ensure inclusion

    by taking into account the diversity of the stakeholders in terms of literacy including digital literacy. social and economic status as well as their role inside the project.

Image here template (1)

The solution

Implement a capacity building plan on two fronts:

  • Design of a flexible strategy

    that accommodates the needs of interested parties, project requirements and geographical context.

  • Establishment of a measurement strategy

    for capacity building activities in line with the Kirkpatrick Evaluation Model.

  • Accompaniment to different actors

    who design, develop and facilitate capacity-building activities so that they meet the criteria established by the strategy.

Image here template (1)

The results

A capacity strengthening strategy organized around three axes:

  • Stakeholder needs

  • Project requirements

  • Territorial context of the project